beautypg.com

Leveling legs, Subbase fuse kit, Subbase power disconnect switch – Carrier Packaged Terminal s & Heat Pumps 52P User Manual

Page 21

background image

21

Leveling Legs

Part No.: LEVELING-LEGS
Leveling legs attach easily to Carrier’s wall sleeve and

offer accurate leveling and support for units without a

subbase. Leveling legs are adjustable from 3

1

/

4

to

5

1

/

2

inches.

Subbase Fuse Kit

Part No.: SUBBASE-FUSE-15A

Part No.: SUBBASE-FUSE-20A

Part No.: SUBBASE-FUSE-30A

The fuse kit provides in-line overcurrent protection at

the unit when required by NEC (National Electric

Code) or local codes.

Subbase Power Disconnect

Switch

Part No.: SUBBASE-SWITCH
The subbase power disconnect 2-pole switch provides

a recessed power disconnect for the PTAC unit when

required by NEC or local codes.

IMPORTANT: The Fuse Kit can only be used with

the electrical or hardwired subbase.

IMPORTANT: This accessory can only be used

with the electrical or hardwired subbase.

Subbase Fuse Kit

ON

Power Disconnect Switch Assembly

Leveling-Legs