Installing the Dell PowerVault 51F Switch
1-1
C H A P T E R 1
Installing the Dell™ PowerVault™
51F Switch
The complete setup for the Dell PowerVault 51F switch includes:
•
Unpacking the switch
•
Selecting a location and mounting method
•
Setting up connections
•
Changing default user names/passwords (see Table 3-2 for more information
about default user names).
Unpacking the PowerVault 51F Switch
NOTE: Some items may be shipped as part of an over-pack.
While unpacking the switch, check to make sure the following items are included:
•
PowerVault 51F switch unit
•
Power cord
•
Five copper gigabit interface converter (GBIC) modules or four optical and one
copper GBIC modules are installed, depending on the switch configuration
•
Straight-through serial cable
•
User’s Guide and this Installation and Troubleshooting Guide
•
Dell PowerVault system utilities diskette
•
Installation kit, which includes rubber mounting feet
Save packing materials in case you need to return the switch.
Cooling Requirements
Cooling air is drawn into the chassis by six fans mounted near the back of the chassis,
venting exhausted air through the front of the switch.