beautypg.com

Related topics, Swing-down railing section, Lid opening – Great Plains 1625AHL Operator Manual User Manual

Page 45

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

41

2014-04-21

Table of Contents

Index

411-020M

Related Topics
For Loading All Materials” on page 35
Dry Fertilizer Unloading and Clean-Out” on page 105

Swing-Down Railing Section
Refer to Figure 27
If fertilizer will be loaded via auger, from behind the
planter, the walkboard handrail height may be reduced
for auger tube clearance.

At each side, pull cross-pins

out and make

1

4

turn.

Release pin into shallow detents. Swing railing toward
hopper.

Auger height required is:

2.9 m (9 feet 6 inches):

Lid Opening
Keep lid closed. Keep tightly closed for operations. Keep
loosely closed for storage. Open only for material
loading, hopper clean-out and exceptional maintenance.

Refer to Figure 27
1.

Lift handle

.

Refer to Figure 28 and Figure 29
2.

Swing handle

out until hook

releases from

U-bolt.

3.

Move hook

clear of U-bolt and re-close handle.

Refer to Figure 29
4.

Lift lid slightly at pivot end to clear strainer

.

5.

Swing lid away from walkboard. Open only enough
to accomplish the present task.

6.

Check that the strainer basket

is clean and in

place.

Do not operate without a strainer:
It is an important safety feature that prevents accidental entry
into the hopper. It also prevents larger foreign matter from
clogging the meter and air system.

7.

Inspect the hopper to ensure that it is empty, and
free of foreign matter that could foul the meter.

2

1

Figure 27

3520 Liter Fertilizer Hopper

34448

1

Figure 28

Hopper Lid Unlatched

32455

2

3

2

2

3

3

Figure 29

Hopper Lid Opening

32456

3

4

5

5

5

This manual is related to the following products: