Appendix c - initial setup, Hydraulic charge and bleed, Seed monitor console installation – Great Plains 1625AHL Operator Manual User Manual
Page 160: Mvt console installation, Pm400 console installation
![background image](/manuals/599115/160/background.png)
411-020M
2014-04-21
156
1625AH
Great Plains Manufacturing, Inc.
Appendix C - Initial Setup
Hydraulic Charge and Bleed
Connect the planter to a suitable hydraulic source and check the condition of the hydraulic systems:
“Unfolding the Planter” on page 26,
“Raising/Lowering Planter” on page 29,
“Folding the Planter” on page 30,
“Fan General Operating Information” on page 53,
“Marker Operation” on page 61
See “Bleeding Hydraulics” on page 115 if any circuits do not operate smoothly.
Seed Monitor Console Installation
MVT Console Installation
See the DICKEY-john
(11001-1643) for details on console installation.
The only cab connections for the harness are power and
harness to hitch.
PM400 Console Installation
Refer to Figure 132
The PM400 seed monitor system includes a console
that needs to be mounted in the cab of the tractor to be
used with the planter.
The monitor includes cables for power
, speed
sensor
and sensor harnesses
. Installation
instructions are found in the included DICKEY-john
®
manual.
Power required is 12Vdc. Power color code is:
+ positive: red
- negative: black
The included bracket
requires customer-supplied
fasteners.
Transport and Field Safety Risk:
Mount the module so it is easy to monitor during planting, but
does not interfere with safe operation of the tractor in the field
or on public roads.
Figure 132
PM400 Tractor Components
32005
1
3
4
2
5
1
2
3
4
5