Page 154: Unload truck
411-020M
2014-04-21
150
1625AH
Great Plains Manufacturing, Inc.
Appendix B - Pre-Delivery
Pre-Delivery Safety
Have all workers review “Important Safety Information”
starting on page 1.
Perform no assembly while the planter is on the trailer.
Tools Required
• planter Parts manual (411-020P)
• two or more workers
• tractor or tug with a planter-compatible hitch
• an overhead lifter (forklift or crane) capable of raising a
marker arm 12
1
⁄
2
feet (3.8 m). The arm may be over
12 feet (3.7 m) long and weigh up to 300 pounds
(135 kg)
• pallet jack or other low-profile mobile lifting device with
a capacity of at least 152 kg (335 pounds).
• small jack
• ladder
• basic hand tools
Note: An orientation rose shows isometric Up, Wing,
Back, Down, Center and Front in some illustrations.
Unload Truck
Refer to Figure 122
Due to the overhanging main transport wheels
, an
end dock or
pit dock
is recommended for unload. If a suitable dock is not
available, contact the factory for hoist instructions.
1.
With the trailer at the dock, remove all uncrated
components shipped on the trailer deck
.
2.
Any crated components
may be removed at any
time.
3.
Hitch the planter to a tractor or tug to prevent
movement after tie-down release.
4.
Release all tie downs.
5.
Carefully tow the planter off the deck. Move it to a
flat, level location with sufficient room to allow later
unfolding.
U
D
C
W
B
F
Equipment Damage Risk:
If the trailer bed will be fully depressed into a pit dock, release
tie downs, except at wing casters
, before the transport
wheels contact the dock sides. If the planter is left fully tied
down, it could sustain damage, or lift the trailer from the
tractor upon transport wheel contact.
Figure 122
Planter on Trailer
34382
2
1
3
4
5
2
6
1
3
4