Attaching box to frame – Great Plains V-300F Predelivery Manual User Manual

Page 18

background image

V300, V300F

148-057Q

1/2/2006

16

Attaching Box to Frame

1.

Attach lift straps to box and secure to forklift or
other implement.

2.

Remove bolts securing box to rack.

3.

Carefully lift box out of rack.

Refer to Figure 20

4.

Using forklift or other implement, align box
with frame.

NOTE: Do not remove lift straps from box at this
point. Some assembly required before lift straps
can be removed.

Refer to Figure 21

5.

Place pivot washer between top of frame and
top of box where box and frame attach.

6.

Place other pivot washer between bottom of
frame and bottom of box where box and frame
attach.

7.

Secure frame to box using pivot shaft weld-
ments, pivot shaft bolt weldment, 5/8-11 x 2 1/
4 bolts, 5/8 lock washers and 5/8-11 hex nuts.

NOTE: Once box is attached to frame, loosen hex
lock nuts securing leaf spring. U-bolts should dan-
gle inside.

23320

Figure 20

Aligning Box with Frame

23300

23321

Figure 21

Securing Box to Frame