Tongue, Leaf spring – Great Plains V-300F Predelivery Manual User Manual
Page 16
V300, V300F
148-057Q
1/2/2006
14
Tongue
Refer to Figure 14
1.
Using forklift or other implement, position
tongue to frame. Secure tongue to frame
using tongue rear cross pin, washer, 1-8
hex nut, and 5/8-11 x 2 3/4 bolt and 5/8-
11 hex nut.
Refer to Figure 15
2.
Remove bolts securing tongue links (5)
to level link pivot lever (3). Keep bolts for
reuse.
3.
Attach level link pivot lever (3) to top of
frame (1) using link pivot cross pin (6)
and bolt.
4.
Replace tongue links (5) to level link piv-
ot lever (3) using bolts removed in step 2.
5.
Secure tongue links (5) to tongue using
bolts (4) and nuts.
Leaf Spring
Refer to Figure 16
1.
Remove roller stop, pin roll, and roller
stop pin from one end of leaf spring.
Keep all pieces for reuse.
2.
Remove four u-bolts and hardware from
back of frame. Keep all pieces for reuse.
3.
Slide leaf spring in through opening in
back of frame. Attach to frame with u-
bolts, washers, and hex lock nuts.
4.
Reattach roller stop, pin roll, and roller
stop pin to end of leaf spring.
NOTE: Be sure bolts securing leaf spring are
tightened.
23310
Figure 14
Securing Tongue to Frame
23317
Roller Stop
U-bolts and Hardware
Leaf Spring
Roller Stop Pin
Pin Roll
Figure 16
Installing Leaf Spring
23304
Figure 15
Attaching Level Link Pivot Lever