beautypg.com

Figure 28, Neutralization and preconcentration, Figure 29 – Metrohm 850 Professional IC MSM-HC MCS Prep 3 User Manual

Page 61: Injection and sequential suppression, Injection valve 1 (28-a) to position, Injection valve 2 (28-c), 2) onto the

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

850 Professional IC Anion – MSM-HC – MCS – Prep 3

■■■■■■■■

51

The analyte ions are retained on the preconcentration column
(28-D) while the transfer solution flows to the waste container.

A

B

C

D

1

2

Figure 28

Neutralization and preconcentration

1

Sample

2

Transfer solution

A

Injection valve 1

B

SPM

C

Injection valve 2

D

Preconcentration column

3 Injection and sequential suppression

Injection valve 2 is switched:

– Injection valve 1 still is in position Inject.
Injection valve 2 (29-C) in position Inject.

With the eluent flow (29-3) the analyte ions retained on the pre-
concentration column (29-D) are rinsed onto the separation col-
umn (29-E).

The sequential suppression with the MSM-HC (29-F) and the MCS
follows after the separation.

C

F

D

E

3

Figure 29

Injection and sequential suppression

3

Eluent

C

Injection valve 2