beautypg.com

Metrohm 850 Professional IC MSM-HC MCS Prep 3 User Manual

Page 112

background image

5.10 Sample preparation module (SPM)

■■■■■■■■■■■■■■■■■■■■■■

102

■■■■■■■■

850 Professional IC Anion – MSM-HC – MCS – Prep 3

4 Inserting the new SPM rotor A

Caution

An incorrectly inserted SPM rotor A (53-3) can be destroyed dur-
ing first use.

Insert the new SPM rotor A (53-3) in the SPM housing (53-4) in
such a way that the tubing connections on the rear of the SPM
rotor A fit into the corresponding recesses inside the SPM housing
and one of the three holes of the SPM rotor A is visible from
below in the slot (53-5) of the SPM housing.

If the SPM rotor A (53-3) is correctly inserted, its sealing surface
will be approx. 4 mm within the SPM housing (53-4). If this is not
the case, the SPM rotor A must be moved into the right position
from below using a sharp object (e.g. screwdriver).

5 Cleaning the SPM connecting piece

Clean sealing surface of the SPM connecting piece (53-2) with
ethanol using a lint-free cloth.

6 Inserting the new SPM connecting piece

Insert the SPM connecting piece (53-2) into the SPM housing
(53-4) in such a way that the connector
1 is on top and the three
pins of the SPM connecting piece fit into the corresponding
recesses on the SPM housing (53-4).

7 Connecting and conditioning the SPM

Reconnect the SPM to the IC system.

Before switching the SPM over for the first time, rinse the three
neutralization units with solution for 5 minutes.