beautypg.com

Startup sequence, Startup sequence -13 – Rockwell Automation 2706-LV2S_LV4S DL40 PLUS SLAVE USER MANUAL User Manual

Page 30

background image

Publication 2706-6.3

Installation and Startup

3-13

Startup Sequence

When power is applied to the DL40 Plus Slave a powerup sequence
of displays are shown. The first display on powerup is the sign-on
banner identifying the hardware and firmware:

Following the sign-on banner, all of the display pixels are turned on
for 2 seconds followed by a series of informational messages
indicating the current DIP switch settings. Each display lasts for
about four seconds.

After the status messages are displayed, the DL40 Plus Slave clears
the display and enters the selected run mode.

DL40 PLUS SLAVE 2L

VER 1.00 (10/16/98)

DL SLAVE MODE

ENGLISH TEXT

DL SLAVE MODE

PV SLAVE MODE

TERMINAL MODE

DIAGNOSTIC MODE

ENGLISH

INTERNATIONAL TEXT

CYRILLIC TEXT

ENGLISH TEXT (2)

SERIAL ADDRESS: XXX

0 to 127

19200 BAUD (N-8-1)

19200

9600

1200

300

Parity / Data Bits / Stop Bits

N - 8 - 1

E - 7 - 1

O - 7 - 1

CURSOR ENABLED

AUTO LINE ENABLED

CURSOR ENABLED

CURSOR DISABLED

AUTO LINE ENABLED

AUTO LINE DISABLED