T-armor, Peak - fixed – Metal Sales T-Armor Series User Manual
Page 67
© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14
67
T-ARMOR
PEAK - FIXED
INSTALLATION NOTES
1. Install Roof Cleat and secure with #10-12x1" PH Wood
Screws spaced 1'-0" oc.
2. Install Eave Plate and fasten into place with #14-13
Deck Screws at 1'-0" oc. If more than one Eave Plate is
required then butt the ends together.
3. Place panels on the Eave Plate and apply a row of
Double Bead Tape Sealant across panel, up and over all
ribs approximately 2" to 3" from panel end.
4. Field-cut Z-Closure to fit between the panel ribs. Install
Z-Closure over Tape Sealant. Before continuing, make
sure Z-Closure placement will accommodate Peak
flashing.
5. Once Z-Closure is set in Tape Sealant, fasten through Z-Closure, Tape Sealant, T-Armor panel and into
the Eave Plate with #12-14x1" Self Driller N/W screws (see page 75 for number and location of fasteners
required).
6. Apply Double Bead Tape Sealant on top of Z-Closure and install Peak by hooking the open hem around the
Z-Closure and engaging with Roof Cleat.
7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of
2" placing a bead of Tube Sealant between the flashings and secure with Pop Rivets, 2.5" oc.
T-Armor Panel
Clip w/ (2) #14-13 Deck Screws
Double Bead Tape Sealant
#12-14x1" SD N/W (1 per rib)
Z-Closure (see Pg 75)
#12-14x1" SD N/W (see Pg 75)
Panel Turn Up
Moisture Barrier (By others)
#10-12x1" PH Woodscrew (1'-0" oc)
#14-13 Deck Screws (1'-0" oc)
Bearing Plate
Eave Plate
Peak
Roof Cleat
1
/
2
:12 Slope
Minimum
Wood Blocking
Metal Decking (By others)
Additional #14-13 Deck
Screws may be required for
areas with large snow loads
*Panel cap not shown for clarity
9" max