Installation of panel – Metal Sales T-Armor Series User Manual
Page 52
© Metal Sales Manufacturing Corporation / Subject to change without notice 09/14
52
INSTALLATION OF PANEL (
cont
.)
12. Field-drill the first hole (using a 5/16" bit) through both panels for
9
/
32
" Bulb-Tite Rivet fasteners (see below for number of
fasteners require for each width of panel) and install first Bulb-Tite Rivet, drill second hole and install the second Bulb-
Tite Rivet, continue untill all fasteners have been installed.
13. Install
9
/
32
" Bulb-Tite Rivet with hand rivet pullas as shown on page 16 or a power rivet puller where the peak panel laps
over the eave panel and fasten in accordance with fastening pattern sequence shown below. Do not exceed 2.5" between
Rivets.
14. Repeat these steps for subsequent endlaps.
BULB-RIVET FASTENING PATTERN
SELF DRILLER FASTENING PATTERN
1
1
1
1
3
3
3
3
5
5
5
7
6
6
2
2
2
2
4
4
4
4
12" Panel Profile
12" Panel Profile
16" Panel Profile
16" Panel Profile
18" Panel Profile
18" Panel Profile
24" Panel Profile
24" Panel Profile
1
1
1
1
3
3
3
3
5
5
5
5
7
6
7
9
2
2
2
2
4
4
4
4
6
8
10
6
8
7