Delivery, transport and setting up, 1 safety regulations, 2 delivery – Memmert HPP 108/749 Constant climate chamber (Generation 2003) User Manual
Page 17: 3 storage after delivery, 4 setup

17
Delivery, Transport and Setting Up
3.
Delivery, transport and setting up
3.1 Safety
regulations
Warning!
You may get your hands or feet squashed when transport-
ing and installing the constant climate chamber. You should
wear protective gloves and work shoes.
Warning!
Because of the weight of the constant climate chamber, you could
cause yourself an injury if you try to lift it. At least two people are
needed to carry the constant climate chamber HPP 108, and four for
the constant climate chamber HPP 749.
Warning!
The constant climate chamber could fall over and seriously injure
you. Never tilt the constant climate chamber and only transport it in
an upright position.
3.2 Delivery
The constant climate chamber can be packaged in cardboard or in a box, and is delivered on a
wooden pallet.
3.2.1 Unpacking
Remove the cardboard packaging by pulling upwards or cutting carefully along an edge.
3.2.2 Checking for completeness and transport damage
►
Check the delivery note to ensure that the delivery is complete.
►
Check the constant climate chamber for damage.
If you notice deviations from the delivery note, damage or irregularities, do not put the
constant climate chamber into operation, but inform the haulage company and the manufac-
turer.
3.2.3 Disposal of packaging material
Dispose of the packaging material (cardboard, wood) in accordance with the appropriate
regulations for the material in your country.
3.3
Storage after delivery
If the constant climate chamber is initially to be stored after delivery: Read the storage condi-
tions from page 58 .
3.4
Setup
The installation site must be flat and horizontal and must be able to reliably bear the weight
of the constant climate chamber (see chapter Technical data on page 14 ). Do not place the
appliance on a flammable surface.
An 230 V/16 A/115 V power connection (see nameplate) must be available at the installation
site.