2 before you start, Product completeness check, Installation requirements – 2N Analogue UMTS gateway 2N SmartGate UMTS - Manual, 1699 v1.1.0 User Manual
Page 17: Before you start 2.2

Before You Start
2.2
17
2.2 Before You Start
Product Completeness Check
Check the product for completeness before installation please:
n
1× 2N
®
SmartGate UMTS
n
1× Magnetic Antenna with coax cable
n
1× Supply adapter
n
2× Telephone Cable
n
1× PC-connection USB cable
n
1× SMS sending input connector
n
2× Dowel
n
2× Screw
n
1× CD-ROM with User Manual and software
1)
n
1× Quick Installation Guide
Note
n
1)
Enclosed software:
2N® SmartGate PCManager
2N® SmartGate SMS gateway for easy SMS sending and receiving
2N® SmartGate UMTS Driver for PC
User Manual in PDF format
Installation requirements
n
2N® SmartGate UMTS is designed for vertical mounting on suspension holes
(use the mounting pattern). This position is the best for signal reception because
a vertical antenna is used. 2N® SmartGate UMTS can be operated in the
horizontal position too where the UMTS/GSM signal is good.
n
Install 2N® SmartGate UMTS with respect to the UMTS/GSM signal strength –
check the signal strength using the PCManager.
n
Place 2N® SmartGate UMTS out of range of sensitive devices and human bodies
for electromagnetic interference reasons.
n
For the allowed range of operating temperatures refer to the “Technical
Parameters”.
n
2N® SmartGate UMTS can disturb other telecommunication systems. Place
phone lines and connected terminals and PBX’s faraway from antenna.
n
It is impossible to operate 2N® SmartGate UMTS on sites exposed to direct
solar radiation or near heat sources.