2 base frame covers, Base top cover - installation, Step plate/battery charger cover - installation – JLG 1230ES Service Manual User Manual
Page 38: Battery tray/side door - installation, 2 base frame covers -2

SECTION 4 - BASE COMPONENTS
4-2
– JLG Lift –
3121222
4.2 BASE FRAME COVERS
Base Top Cover - Installation
NEVER WORK UNDER AN ELEVATED PLATFORM UNTIL THE
PLATFORM HAS BEEN SAFELY RESTRAINED FROM ANY MOVE-
MENT BY BLOCKING OR OVERHEAD SLING.
Step Plate/Battery Charger Cover - Installation
Battery Tray/Side Door - Installation
Base Top Cover Installation
1. Base Top Cover
2. (4) Attach Screws/Washers
Step Plate/Battery Charger Cover Installation
1. Step Plate Cover
2. Attach Screws/Washers/Nuts
Battery Tray/Side Door - Installation
(Same for both sides)
1. Battery Tray/Door
2. Cutout in Base Frame
3. Washer(s)
4. Base Frame Hinge
5. Door Latch Pin
NOTE: Before assembly lubricate (coat) the door hinge pins with
Loctite Moly Paste Lubricant (JLG Part No. - 3020039).
Lift door (1) into cutout in base frame (2), align the upper
and lower hinge pins on the door with the holes in the
upper and lower base frame hinge (4) and lower door
until set.
If door needs any adjustment up or down to align with the
latch pin slot (5), remove the door and add or remove
washers (3) at the upper hinge pin.