be easier to use nut-serts at the forward-most

hardware locations on either side as well, so

we have provided 2 additional nut-serts for this

purpose, in the hardware kits for those vehicles.
10. If installing Comp-Cut corners, use a

pneumatic body saw or other suitable tool

to cut along the previously-marked cut lines.

De-bur the cut edges with a grinder or file.

It is recommended to spray an aerosol clear

coat over the areas where exposed metal

shows through. Comp Cut corners require

the relocation of the tailgate hinges on TJ’s

and YJ’s as well as the relocation the rear

body mount on all vehicles

11. If installing the LED taillights, cut out the

hole using a 4.5” hole saw or pneumatic

body saw. Be sure to check for wiring behind

the sheet metal prior to cutting. On CJ8’s

with LED’s the horizontal portion of the inner

wheel well will need to be trimmed. Spray

the exposed cut edges with clear-coat to

prevent rust.

12. Using the supplied hardware, re-install the

Crusher Corner into place. Loosely install

flat head cap screw, flat washer (on the back

side) and lock nut. Do not tighten hardware

at this time (allow the Crusher Corner to

“float” until all hardware is loosely installed).

Once all hardware is in place, carefully align

the Crusher Corner into place, then tighten

all hardware using the 7/32 hex key and 9/16

wrench.

13.

If installing LED taillights, continue

with Poison Spyder’s separate instruction

sheet “LED TAILLIGHTS & FLASHERS

INSTALLATION”, which came with your

LED taillights (if purchased through Poison

Spyder) or may be downloaded in PDF form

from the Tech Library section of our website.

13. Re install any OE pieces that will re reused

(flares, gas filler bezel, license plate bracket

or OE taillights).