beautypg.com

Fast & Fluid II Series Blendorama User Manual

Page 26

background image

p25

© Fast & Fluid Management, Blendorama series II

>

>

(7) Once in position, press
the metalcal firmly onto the
gauge, ensuring it adheres
to the gauge along its full
length with no creases or
bubbles (use a clean cloth to
apply if necessary).

(8) Refit the black (outer)
gauge to the plunger and
remove the red (inner)
gauge from the pump.

(9) Peel the adhesive
backing off the remaining
red metalcal.

>

>

(10) Align the end of the
metalcal up against the
bottom edge of the gauge
knob (the metalcal is cut to
size before leaving the
factory).

(11) Once in position, press
the metalcal firmly onto the
gauge, ensuring it adheres
to the gauge along its full
length with no creases or
bubbles (use a clean cloth to
apply if necessary).

(12) Refit the red gauge to
the plunger.