C - metalcal replacement (models 53 xb) – Fast & Fluid II Series Blendorama User Manual
Page 25

p24
© Fast & Fluid Management, Blendorama series II
C - Metalcal replacement (Models 53 XB)
Before replacing the metalcals, calibrate the plungers as per the calibration instructions. Also make sure that
the replacement metalcal is the correct one - check the part numbers.
>
>
(1) Remove both black and
red gauges.
(2) Peel the metalcals off
both the red and black
gauges, and remove all
traces of adhesive (use a
solvent if necessary). Wipe
dry.
(3) Replace both gauges and
set to the fully down
position. Lift the black
(outer) gauge and engage
the locking pin in the 2nd
hole from the top.
>
>
(4) Mark a line on the black
gauge, level with the top of
the red handle. Use a fine
felt tip pen or pencil (or
scratch with a sharp object),
then remove the black gauge
from the pump.
(5) Peel the adhesive
backing off the black
metalcal.
(6) Align the end of the
metalcal up against the
bottom edge of the gauge
knob, checking that the first
line of the metalcal (the line
below the first numeral)
lines up with the marked line
of the gauge (the metalcal is
cut to size before leaving the
factory).