Figure 4: Base Gasket Installation

II. Knocked-Down Boiler Assembly

WARNING

Installation of this boiler should be undertaken

only by trained and skilled personnel from a

qualified service agency.

A.

Install Base-Burner-Manifold Assembly

1. Base-Burner-Manifold is shipped assembled from

factory (Gas Valve and Pilot/Burner Assembly is

shipped in the "Gas Controls Carton").

2. Unpack base assembly and place in location where

boiler is to be installed (Refer to Section I: Pre-

Installation).

B.

Install assembled cast iron sections on base assembly:

1. Install (4) 5/16" x ¼" self-tapping screws through

(4) holes in upper base flange with screw heads on

underside of flange. Note: Screws are located in

fiber gasket parts bag.

2. Install ceramic fiber gasket. See Figure 4.

3. Position boiler above base with lugs cast in boiler

sections centered over screws protruding from top of

base. Lower boiler onto base taking care not to

disturb ceramic fiber gasket. Secure with 5/16"

locknuts and washers provided. See Figure 5.

Figure 5: Section Assembly Attachment

4. Loosen nuts on tie rods until only finger tight.
5. If Steam boiler or Water boiler less tankless heater,

proceed to Step C.

6. Water Boiler with tankless heater. Remove heater

opening cover plate and install tankless heater as

follows:
a. Place rubber gasket over heater coil and against

heater plate. Align holes in plate and gasket.

b. Install water heater coil through opening into top

nipple ports of boiler and fasten with 3/8" hex

head machine screws and flat washers.

Note: If tankless heater is not installed, heater

opening cover plate must remain in place.

C.

Test boiler for leaks before connecting to system and

installing controls, trim and jacket.
1. Attach pressure gauge (capable of indicating 30 psi)

on boiler.

2. Attach fill valve and piping to return tapping and

purge valve to supply tapping. See Figure 6.

Figure 6: Hydrostatic Pressure Test

3. Install plugs in remaining tappings.
4. Fill boiler completely with water by venting air

through purge valve. Close purge valve and apply

water pressure of at least 10 psi but not exceeding

30 psi gauge pressure.

5. Examine boiler carefully inside and outside for leaks

or damage due to shipment or handling.