beautypg.com

Information checklist, Information checklist -2 – Xerox WorkCentre PE120-120i-4396 User Manual

Page 26

background image

Page 2-2

Xerox WorkCentre PE120i System Administration Guide

Ba

si

c N

e

tw

o

rk

I

n

st

a

lla

ti

on

Information Checklist

Before starting the basic network installation procedures, please ensure the following items
are available or have been performed:

CAUTION: Do not connect the network cable to the WorkCentre PE120i until
instructed to do so.

Item

By

An existing operational network utilizing TCP/IP is required, these
procedures are not designed to install a network.

Customer

A suitable network cable.

Customer

If you are going to configure TCP/IP manually, you need to obtain and
record the following information:

• TCP/IP Address:

• Gateway Address:

• Subnet Mask Address:

• Primary DNS Server Address:

Refer to the Glossary for additional information on the Gateway
Address, Subnet Mask Address and Primary DNS, if needed.

Customer

Test the WorkCentre PE120i to ensure it is installed fully and
functioning correctly.

Customer

WorkCentre PE120i print and fax drivers.

Xerox