Document Outline
- Introduction and Safety
- Transportation and Storage
- Product Description
- Installation
- Preinstallation
- Baseplate-mounting procedures
- Pump-to-driver alignment
- Alignment checks
- Permitted indicator values for alignment checks
- Alignment measurement guidelines
- Attach the dial indicators for alignment
- Pump-to-driver alignment instructions
- Perform angular alignment for a vertical correction
- Perform angular alignment for a horizontal correction
- Perform parallel alignment for a vertical correction
- Perform parallel alignment for a horizontal correction
- Perform complete alignment for a vertical correction
- Perform complete alignment for a horizontal correction
- Grout the baseplate
- Piping checklists
- Commissioning, Startup, Operation, and Shutdown
- Maintenance
- Troubleshooting
- Parts Listings and Cross-Sectionals
- Close-coupled S-group (all) and M-group (2 x 3 - 8 only) — stainless steel
- Close-coupled S-group (all) and M-group (2 x 3 - 8 only) — Hastelloy-C
- S-group with bearing frame — stainless steel
- S-group with bearing frame — Hastelloy-C
- Frame cooling options
- M-group with bearing frame — stainless steel
- M-group with bearing frame — Hastelloy-C
- Spare and repair parts
- Interchangeability drawings
- Other Relevant Documentation or Manuals
- Local ITT Contacts