Document Outline
- Introduction and Safety
- Transportation and Storage
- Product Description
- Installation
- Preinstallation
- Baseplate-mounting procedures
- Install the pump, driver, and coupling
- Pump-to-driver alignment
- Alignment checks
- Permitted indicator values for alignment checks
- Alignment measurement guidelines
- Attach the dial indicators for alignment
- Pump-to-driver alignment instructions
- Perform angular alignment for a vertical correction
- Perform angular alignment for a horizontal correction
- Perform parallel alignment for a vertical correction
- Perform parallel alignment for a horizontal correction
- Perform complete alignment for a vertical correction
- Perform complete alignment for a horizontal correction
- Grout the baseplate
- Bypass-piping considerations
- Piping checklists
- Commissioning, Startup, Operation, and Shutdown
- Preparation for startup
- Remove the coupling guard
- Check the rotation
- Impeller-clearance check
- Impeller-clearance setting
- Couple the pump and driver
- Bearing lubrication
- Shaft-sealing options
- Pump priming
- Start the pump
- Activate the i-ALERT™ Condition Monitor
- i-ALERT™ Condition Monitor routine operation
- Pump operation precautions
- Shut down the pump
- Deactivate the i-ALERT™ Condition Monitor
- Reset the i-ALERT™ Condition Monitor
- Make the final alignment of the pump and driver
- Maintenance
- Maintenance schedule
- Bearing maintenance
- Shaft-seal maintenance
- Disassembly
- Disassembly precautions
- Tools required
- Drain the pump
- Remove the back pull-out assembly
- Remove the casing wear ring (S, M, L, and XL)
- Remove the casing wear ring (for XL1, XL2-S, and XL2)
- Remove the suction sideplate
- Impeller removal
- Remove the stuffing box cover
- Remove the TaperBore PLUS™ seal chamber
- Remove the dynamic seal
- Remove the frame adapter from the frame (XL1, XL2-S, and XL2)
- Disassemble the bearing frame
- Guidelines for i-ALERT™ Condition Monitor disposal
- Disassemble the spring-mounted baseplate (second generation)
- Preassembly inspections
- Reassembly
- Assemble the bearing frame
- Assemble the frame adapter to the frame (XL1, XL2-S, and XL2)
- Assemble the TaperBore PLUS™ seal chamber
- Assemble the stuffing-box cover
- Install the dynamic seal (S, M, L, and XL)
- Impeller installation
- Install the suction sideplate
- Install the casing wear ring (S, M, L, and XL enclosed impeller)
- Install the casing wear ring (XL1, XL2-S, and XL2 enclosed impeller)
- Install the back pull-out assembly
- Attach the i-ALERT™ Condition Monitor to the pump
- Post-assembly checks
- Assembly references
- Troubleshooting
- Parts Listings and Cross-sectional Drawings
- Certification: CE or CE ATEX
- Other Relevant Documentation or Manuals
- Local ITT Contacts