Figure 53 Overview of Operation to Replace All the Current Alternate Paths with Newly-added Alternate
Paths
.
To replace all the current alternate paths (A and B) with newly-added alternate paths (C and D):
1.
Execute the Disconnect Paths command on the alternate path A (see 5.16).
2.
Disconnect the cable which the alternate path A uses, and connect the cable which the alternate
path C uses.
3.
Cancel the configuration of the alternate path A, and add the alternate path C (see 5.5.4).
4.
Click the Apply button to apply the settings of the alternate paths A and C.
5.
Make sure the status of the alternate path C is Normal.
At this point, the alternate paths B and C are configured as normal paths.
Take the following steps to delete the alternate path B and add the alternate path D.
6.
Execute the Disconnect Paths command on the alternate path B (see 5.16).
7.
Disconnect the cable which the alternate path B uses, and connect the cable which the alternate
path D uses.
8.
Cancel the configuration of the alternate path B, and add the alternate path D (see 5.5.4).
9.
Click the Apply button to apply the settings of the alternate paths B and D.
10.
Make sure the status of the alternate path D is Normal.