Installation, Required tools, Site preparation – Avaya Stackable Switch P3343T-ML User Manual
Page 33: Chapter 4, Installation required tools site preparation

Avaya P334T-ML User’s Guide
17
Chapter 4
Installation
The P334T-ML is ready to work after you complete the installation instructions
below.
Required Tools
Make sure you have the following tool at hand before undertaking the Installation
procedures:
•
Phillips (cross-blade) screwdriver
Site Preparation
You can mount Avaya P330 switches alone or in a stack in a standard 19-inch
equipment rack in a wiring closet or equipment room. Up to 10 units can be stacked
in this way. When deciding where to position the unit, ensure that:
•
It is accessible and cables can be connected easily and according to the
configuration rule.
•
Cabling is away from sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines, and fluorescent lighting fixtures.
•
Water or moisture cannot enter the case of the unit.
•
There is a free flow of air around the unit and that the vents in the sides of the
case are not blocked.
L Use Octaplane cables to interconnect with other switches.
•
The environmental conditions match the requirements listed below:
Table 4.1
Environmental Prerequisites
Operating Temp.
-5 to 50°C (23 to 122°F)
Relative Humidity
5% to 95% non-condensing