beautypg.com

Section 2 - installation, 1 unpacking and inspection, 2 terminations and controls – KEPCO BOP 1KW-MG Operator Manual, Firmware Ver.2.38 to 2.47 User Manual

Page 39: Figure 2-1. bop series rear panel, Unpacking and inspection -1, Terminations and controls -1, Bop series rear panel -1, 1, t

background image

BOP HIPWR 080709

2-1

SECTION 2 - INSTALLATION

2.1

UNPACKING AND INSPECTION

This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.3. If any indication of damage is
found, file an immediate claim with the responsible transport service.

2.2

TERMINATIONS AND CONTROLS

a) Front Panel: Refer to Figure 3-1 and Table 3-1.

b) Rear Panel: Refer to Figure 2-1 and Table 2-1.

FIGURE 2-1. BOP SERIES REAR PANEL