Agilent Technologies G6600-90006 User Manual
Page 12

12
Operation and Maintenance Manual
41
Figure 10. Drawing of the Detector with Dual Plasma Burner and Controller
42
42
Step 2: Unpack and Inspect the Instrument
45
45
Step 3: Set Up the Vacuum Pump
Installing the Edwards RV5 Pump Oil-Sealed Vacuum Pump
Figure 11. RV5 Oil-Sealed Vacuum Pump and Associated Traps (Front Side)
Figure 12. RV5 Oil-Sealed Vacuum Pump and Associated Traps (Back Side)
49
Figure 13. RV5 Oil- Sealed Vacuum Pump and Associated Traps (Top)
Figure 14. RV-5 Oil-S ealed Vacuum Pump Exhaust Line
51
Installing the Welch Dry Piston Vacuum Pump
52
Figure 15. The Welch Dry Piston Pump
54
Figure 16. Oil Drain Kit with Ballast Control
Step 4: Connect the Power Cord
56
Figure 17. SCD Rear Panel Diagram
Step 5: Install the Dry Compressed Air or O
2
Supply
57
Step 6: Install the Signal Output Cables
58
HP 3390 Series Integrator Cable Connection
58
HP 3396 Integrator Cable Connection
Agilent 6890 GC Analog Input Board
Step 7: Install the Dual Plasma Burner
Figure 18. Dimensions of GC Liner Cut-Outs
Step 8: Install the Dual Plasma Controller
60
Figure 19. Dual Plasma Controller Rear Panel
60
Step 9: Install Column Connections
Figure 20. Measuring Column Insertion
61