Running a post-processed project, Choosing the survey type/mode and the system setup – Spectra Precision ProMark Field Software User Manual
Page 26

English
20
Running a Post-Processed Project
Choosing the
Survey Type/Mode
and the System
Setup
Use the Survey tab on
ProMark Field’s Options
menu for this setting.
Read the table below to choose the survey type and mode and
the system setup suitable for your project.
Reminder: If you are using a base/rover system, remember in
all cases of use, the two receivers should collect raw data at
the same time at their respective locations, using the same
recording interval, and with no interruption allowed.
Your Project
Setup
Survey
Collecting Raw Data on
One Point:
You want to collect raw data
at the same location
throughout the project. The
receiver is used either as a
base or a rover.
Receiver and antenna
mounted on a tripod:
Post-processing,
Static
Collecting Raw Data on
Several Points:
You want to go to several
points and perform static
occupations on each of
these points. Raw data will
be collected continuously
throughout the project.
Receiver and antenna
mounted on a pole or bipod:
Post-processing,
Stop-and-go Kine-
matic
Collecting Raw Data along
a Line:
You want to walk along a
line and let the receiver
automatically log a series of
points along the way. Raw
data will be collected contin-
uously throughout the proj-
ect.
Post-processing,
Continuous kine-
matic