beautypg.com

Yokogawa Data Acquisition with PID Control CX2000 User Manual

Page 25

background image

3-5

SM 04L31A01-01E

Adjustments

3

Calibration Using Communications

The calibration process proceeds as follows:

1.

Enter Calibration mode

2.

Perform calibration

3.

Store the calibrated values

4.

Return to operation mode

The commands necessary for calibration are listed below.

For the input connection method, see "Input Range Calibration" on page 3-2.

DSp1 Switch to setting mode

p1

0

Switch to operation mode

1

Switch to Set up mode

2

Switch to A/D calibration mode

XZp1,p2,p3

Perform A/D calibration (Cal/Exe)

p1

Group

For control input: 01—05 for the CX1000, and 01—05 or 06—10 for the

CX2000

For measurement input: 01—06 for the CX1000, and 01—10 or 11—20

for the CX2000

p2

Type of operation

Cal/Exec

p3

Calibration range

20 mV, 60 mV, 200 mV, 1 V, 2 V, 6 V, 20 V, Pt100

XZp1,p2,p3,p4,p5

Manual correction of A/D calibration value (Display)

p1

Group

For control input: 01—05 for the CX1000, and 01—05 or 06—10 for the

CX2000

For measurement input: 01—06 for the CX1000, and 01—10 or 11—20

for the CX2000

p2

Type of operation

Display

p3

Calibration range

20 mV, 60 mV, 200 mV, 1 V, 2 V, 6 V, 20 V, Pt100

p4

Zero input value

p5

Full scale input value

XZp1,p2,p3

Store the calibrated values (exit)

p1

Group

For control input: 01—05 for the CX1000, and 01—05 or 06—10 for the

CX2000

For measurement input: 01—06 for the CX1000, and 01—10 or 11—20

for the CX2000

p2

Type of operation: End

p3

Data save selection

STORE Save to a file

ABORT Don’t save

XZp1,DISPLAY?

Get information for calibrated values

p1

Group

For control input: 01—05 for the CX1000, and 01—05 or 06—10 for the

CX2000

For measurement input: 01—06 for the CX1000, and 01—10 or 11—20

for the CX2000

3.1 Calibration of the Measuring Instrument's Input