beautypg.com

Teledyne 9110AH - Nitrogen oxides analyzer User Manual

Page 109

background image

TELEDYNE Model 9110AH NO

X

Analyzer Operator Manual, 01620, Rev. F

8-7

10. Reassemble in the reverse order of disassembly, being sure to seat the paper gasket in the

reaction cell before installing the window. After inserting the window, drop the o-ring in
before inserting the sleeve. Reconnect pneumatics and heater connections, then re-attach the
pneumatic sensor assembly.

11. Perform leak check procedure covered in Section 8.6. Perform light leak procedure covered

in Section 8.7. The cleaning procedure is complete.

12. The analyzer span response will fall 10-12% in the first 1-2 days after cleaning due to the

window re-conditioning.