5

Set-up

5.1

Initial set-up

The wall saw system is delivered ready for set-up. All instructions

in this chapter are equally valid at the initial set-up.

5.2

Preparatory operations

Always proceed as follows:

1)

Settle fundamental conditions

2)

Secure the job site

3)

Determine both position and sequen-
ce of the cuts

4)

Choose the saw blade first and then
the saw motor

5)

Carry out visual inspections and
maintenance works

Prior to putting the system into operation, the following steps are

always to be observed:

Position of supply lines

Inform yourself about the position of supply lines in walls and

ceilings.

Water

Where does the flushing water of the wall saw system drain off?

Take appropriate precautions, if necessary.

Secure the job site

Secure the operating area of the wall saw system. No access to

unauthorized persons! When cutting into walls, pay attention the

other side of the wall! Secure this area too!

Secure cutouts

Secure the cutouts of walls and especially of ceilings by appro-

priate means, e.g. by a crane, supports etc. Consider the weight

of concrete! (1m

3

weighs about 2,6 t)