beautypg.com

Test the operator – Controlled Products Systems Group 222EX43 User Manual

Page 38

background image

20

© 2012 Installation and Reference Manual D0119 Rev. J

Section 3

— Test the Operator

Test the Operator

Complete the installation by testing the operation of the gate.

1. Make sure the operator is turned ON.

2. Close the control box lid.

3. Press OPEN to open the gate. The gate should open at rated speed.