Outline of Installation Steps
Stage 1 — Install the Screen and Projector
c
Mark the screen location (page 12)
c
Install projector to verify location (page 12
).
c
Verify the image location (page 15)
.
c
Cut the ceiling tile (page 16)
.
c
Preliminary safety hardware installation (page 16)
c
Finish projector drop ceiling mount installation (page 17).
c
Secure the projector drop ceiling mount to the ceiling (page 18)
.
c
Install the electrical box (if required) (page 19)
.
c
Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.
c
Install the mud rings (page 23)
c
Pull cables (at the input locations) (page 24)
c
Install the wall plates (page 25)
c
Install the MediaLink Controller (page 26)
.
Stage 3 — Install the FF 120 Speakers.
c
Cut the ceiling tile (page 30)
.
c
Install the speaker on the drop ceiling (page 30).
c
Terminate the speaker cable for the PVS switcher (page 32).
Stage 4 — Install the PMK 550 and the PVS 305SA IP.
c
Install the PMK 550 base plate (page 34)
c
Pull the cables (at the switcher location) (page 35).
c
Finish installing the pole mount kit (page 36)
.
Stage 5 — Configure the PoleVault Switcher and the System.
c
Configure the switcher — MLS Switcher Configuration program (page 37)
.
c
Configure the system — Global Configurator (page 38)
.
c
c
.