beautypg.com

Outline of installation steps – Extron Electronics PoleVault IP Systems PVS 305SA IP User Manual

Page 52

background image

Extron Headquarters

+1.800.633.9876 (Inside USA/Canada Only)
Extron USA - West

Extron USA - East

+1.714.491.1500 +1.919.850.1000
+1.714.491.1517 FAX

+1.919.850.1001 FAX

Extron Europe

+800.3987.6673
(Inside Europe Only)
+31.33.453.4040
+31.33.453.4050 FAX

Extron Asia

+65.6383.4400
+65.6383.4664 FAX

Extron Japan

+81.3.3511.7655
+81.3.3511.7656 FAX

Extron China
+86.21.3760.1568
+86.21.3760.1566 FAX

Extron Middle East

+971.4.299.1800
+971.4.299.1880 FAX

Extron Korea

+82.2.3444.1571
+82.2.3444.1575 FAX

Extron India

1800.3070.3777
(Inside India Only)
+91.80.3055.3777
+91.80.3055.3737 FAX

© 2013 Extron Electronics All rights reserved.

www.extron.com

Outline of Installation Steps

Stage 1 — Install the Screen and Projector

c

Mark the screen location (page 12)

.

c

Install projector to verify location (page 12

).

c

Verify the image location (page 15)

.

c

Cut the ceiling tile (page 16)

.

c

Preliminary safety hardware installation (page 16)

.

c

Finish projector drop ceiling mount installation (page 17).

c

Secure the projector drop ceiling mount to the ceiling (page 18)

.

c

Install the electrical box (if required) (page 19)

.

c

Install the screen (page 19)

.

Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.

c

Install the mud rings (page 23)

.

c

Pull cables (at the input locations) (page 24)

.

c

Install the wall plates (page 25)

.

c

Install the MediaLink Controller (page 26)

.

Stage 3 — Install the FF 120 Speakers.

c

Cut the ceiling tile (page 30)

.

c

Install the speaker on the drop ceiling (page 30).

c

Terminate the speaker cable for the PVS switcher (page 32).

Stage 4 — Install the PMK 550 and the PVS 305SA IP.

c

Install the PMK 550 base plate (page 34)

.

c

Pull the cables (at the switcher location) (page 35).

c

Finish installing the pole mount kit (page 36)

.

Stage 5 — Configure the PoleVault Switcher and the System.

c

Configure the switcher — MLS Switcher Configuration program (page 37)

.

c

Configure the system — Global Configurator (page 38)

.

c

Test the system (page 39).

c

Final installation (page 41)

.