beautypg.com

Config, Secure the mlc 104 ip plus to the mud ring, Connections made to the mlc 104 ip plus – Extron Electronics PoleVault IP Systems PVS 305SA IP User Manual

Page 32: 4c 4a 4b, Pvs 305sa ip switcher rear panel, Tcp/ip network, Mlc 104 ip plus right side panel projector, Extron mlc 104 ip plus, Rs-232 and power, Rs-232 control cat 5 cable

background image

d. The connections between the MLC 104 IP Plus

and the PVS 305SA IP switcher should look like
the figure at right.

e. Sliding the cables into the opening, secure

the MLC 104 IP Plus to the mud ring with the
provided machine screws.

4.06"

3.75"

Wall Mouting

Bracket

Rotate locking arm

and insert into wall

opening.

Extron

MLC 104 IP Plus

Wall

OFF

ON

OFF

ON

CONFIG

DISPLAY

VOLUME

1

2

3

4

MLC 104 IP Plus

ô

Secure the MLC 104 IP Plus to the mud ring

ò

Connections made to the MLC 104 IP Plus

PVS 305SA IP Switcher Rear Panel

L

R

L

R

L

R

AUX AUDIO

INPUT 5

LINE OUT

VOICELIFT

RECEIVER

PAGING

SENSOR

DO NOT

GROUND

OR SHORT

SPEAKER

OUTPUTS

1B RGB

1A RGB

2B RGB

2A RGB

3B RGB

/VIDEO

4B RGB

/VIDEO

3A RGB

4A RGB

I

N
P
U
T
S

RS-232 MLC/IR

2/4/8

Ohms

CLASS 2 WIRING

AMPLIFIED AUDIO OUT

VOL/MUTE

Tx Rx IR

12V

10V

50mA

POWER

RGB

VIDEO

OUTPUTS

CONTROL

N15779

12V
5A MAX

LAN 3

LAN 4

LAN 1

LAN 2

TCP/IP

Network

1

2

3

GR

O

UND

+12V OU

T

CM

GR

O

UND

IR OU

T

GR

O

UND

SCP

GR

OUND

Tx

Rx

DISPLAY

RS-232/IR

A B C D E

COMM LINK

LAN

PRESS TAB WITH

TWEEKER TO REMOVE

A B

MLS

RS-232

POWER

12V

DIGITAL

I/O

IR IN

Tx

GR

OUN

D

Rx

+12V IN

MLC 104 IP Plus Right Side Panel

Projector

RS-232

and Power

4c

4a

4b

RS-232 Control

CAT 5 Cable

PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

28