Gas sampling and gas conditioning technology

4-2.1.1-ME

The frequency of the maintenance work depends on the operational process and can therefore only
be determined in each individual case. Maintenance instructions pertaining to individual components
can be found in the instruction manual for individual components.

All parts which require maintenance work are housed in the gas conditioning system in such a way
so that they are easily accessible. These are (see figure 2):

The filter element of the preliminary filter FP-2T.

N O T E !

In order to protect the analysers which have been additionally
connected, it is recommended that in the event of a
condensation irruption the moist filter elements be replaced.

The preliminary filter for the peristaltic pump PF2. If the condensate contains particle residue, the

preliminary filter should be replace

d at regular intervals. The ‘one-way’ filter is situated in the

suction side of the pump hose (see figure 2) and can be easily replaced;

Hoses of the Condensate pump SR25.1. These should be checked every six months and, if

necessary, replaced;

Diaphragm of the sample gas pump N3KPE or N9KPE. These should be checked every six

months and, if necessary, replaced;