Receipt of goods and storage, Installation instructions – M&C TechGroup PSS-5_3 Operator's manual User Manual
Page 11
11
Gas sampling and gas conditioning technology
4-2.1.1-ME
10
RECEIPT OF GOODS AND STORAGE
The gas conditioning and sampling system PSS-5... is a completely pre-fitted unit.
Please take the gas conditioning system and possible special accessories carefully out of the
packaging material immediately after arrival, and compare the goods with the items listed on the
delivery note;
Check the goods for any damage caused during delivery and, if necessary, notify your transport
insurance company without delay of any damage discovered.
N O T E !
The PSS must be stored in a weatherprotected frost free area.
11
INSTALLATION INSTRUCTIONS
N O T E !
When in use, the gas conditioning system case should be placed
in an area well away from any heat emitting sources in order to
prevent demage caused by an accumulation of heat. The air
vents in the case must be free at all times.
In order to ensure that the case is safe and stable when being
used, it should be laced on a horizontal surface.
The equipment is to be used in a vertical position only. The
perfect functioning of the separation and drainage procedures
will only be guaranteed if the equipment is used in a vertical
position.
When the equipment is beeing used outside, ample protection
against the effects of direct sunlight and dampness must be
provided. In winter, the equipment must only be used in frost
free areas;
It is recommended that the case be protected using one of the
many models available.
In order to guarantee the operational safety of the gas
conditioning system and the additionally connected analysers,
and to avoid false alarms, the gas conditioning system should
not be used at temperatures other than those specified.
It is of great importance that the analysers which have been
additionally connected be used at temperatures well above the
specified gas outlet dew point of +5° C. This prevents the gas in
the connector lines from condensing completely.
In the event of the unheated sample gas lines being connected
to the gas conditioning system on a slope, it is not necessary to
carry out a preliminary condensate removal.