beautypg.com

Description, Figure 1, Dimensions vc-1 – M&C TechGroup VC-2-SL Operator's manual User Manual

Page 8

background image

8

Gas sampling and gas conditioning technology

3-0.1-ME

9

DESCRIPTION

The condensate formed should be removed with a small peristaltic pump, sample trap or collection
vessel. The VC-..-SL pre-cooling unit has as a standard peristaltic pumps SR25.1 for automatic
condensate removal. The VC-..-..L pre-cooling unit has got a fan to force the ventilation of the cooling
fins for performance rise. In this case, a deflector is integrated for an optimal air conduction. The
VC-1-.. pre-cooling unit is equipped with one EC-Jet-Stream heat exchanger. The VC-2-.. pre-cooling
unit is equipped with two EC-Jet-Stream heat exchangers to connect two independent sample streams
or parallel or series function to connect one sample stream with a corresponding high flow rate. The
compact lightweight design of this device makes it ideal for use in portable and continuous sample
conditioning systems. The pre-cooling units are self-controlling with low maintenance.

Figure 1 Dimensions VC-1