START-UP

The following steps should be carried out before initial start-up:

Connect the cooler unit to the mains power supply (except VC-1); Check that the equipment is

connected to the correct mains voltage, 115V or 230V, as shown on the type plate.



15

CLOSING DOWN

N O T E !

The location for the cooler must remain frost-free, even when the unit has
been switched off!
If the cooler unit is putting out of action for a short time no particular
measures need to be taken.
We recommend sweeping the cooler with inert gas or ambient air while
the unit is putting out of action for a longer time.

C A R E !

Aggressive condensate is possible.
Wear protective glasses and proper protective clothing!



16

MAINTENANCE

The safety instructions specific to the plant and process are to be consulted prior to any maintenance
work!

D A N G E R !


Dangerous voltage!
It is necessary to take the gas cooler off the mains before any
assembly, maintenance and repair work is carried out!


The cooler VC-.. does not require any special maintenance intervals.

16.1

CLEANING THE COOLING FINS

Dust on the cooling fins reduces the cooling capacity. Therefore it is necessary to clean the fins from
time to time. The following steps are recommended:

Disconnect the cooler from the mains (except VC-1);

Unscrew the cooler hood and remove it carefully (except VC-1);

Clean the fins carefully with compressed air;

Re-install the cooler hood;