Part number 550-110-260/0200

7

Boiler Manual

Prepare boiler location —

clearances

1b

Figure 1

Recommended clearances for service

Residential garage installation

Precautions

Take the following special precautions when installing
the boiler in a residential garage. If the boiler is located
in a residential garage, per ANSI Z223.1, paragraph
5.1.9
:

Mount the boiler a minimum of

18 inches

above the floor

of the garage to assure the

burner and ignition devices will be no less
than 18 inches above the floor.

Locate or

protect the boiler

so it cannot be

damaged by a moving vehicle.

Provide the following clearances:

1. Hot water pipes — at least ½" from combustible

materials.

2. Recommended service clearances — See

Figure 1

.

3. Minimum clearances for tight spaces — See

Figure 2

.

Boiler model number

Width — Inches

CGs-3

15

CGs-4

18

CGs-5

21

CGs-6

24

Flooring

The CGs boiler is approved for installation on
combustible flooring, but must never be installed on
carpeting.

Do not install boiler on carpeting
even if foundation is used. Fire can
result, causing severe personal
injury, death or substantial property
damage.

Foundation

Provide a solid brick or minimum

2-inch

thick

concrete foundation pad if any of the following is true:

floor can become flooded.

the boiler mounting area is not level.

The minimum foundation size is

25"

long by:

Flooring and foundation

Figure 2

Minimum clearances for tight spaces