beautypg.com

Start-up — operate boiler, Start-up — preparation, Gold cgs gas-fired water boiler – Weil-McLain GOLD CGS 550-110-260/02002 User Manual

Page 28: Inspect system water piping, Continued, Final check before starting boiler, Start the boiler, Check system and boiler, Inspect base insulation

background image

Part number 550-110-260/0200

28

GOLD

CGs

Gas-Fired Water Boiler

Start-up —

operate boiler

7b

Inspect system water piping

After filling the boiler and system
with water,

inspect all piping

throughout the system for leaks. If
found, repair immediately. Repeat
this inspection after the boiler has
been started and the system has
heated up.

Leaks must be repaired at once.

Failure to do so can damage the
boiler, resulting in substantial
property damage.

Do not use

petroleum-based

cleaning or sealing compounds

in

boiler system. Severe damage to
boiler will occur, resulting in
substantial property damage.

Start-up —

preparation

continued

7a

Final check before starting boiler

Read manual section

9

including the

Lighting

instructions

procedure (

Figure 21

, page 34).

Verify the boiler and system are

full of water

.

Verify the

Start-up preparation

procedures of

section

7a

have been completed.

Start the boiler

Follow the

Lighting instructions

from section

9c

to start the boiler.

See section

7c

if boiler fails to start.

Check system and boiler

Do not use

petroleum-based

cleaning or sealing compounds

in

boiler system. Severe damage to
boiler will occur, resulting in
substantial property damage.

Eliminate all system leaks

.

Continual fresh makeup water will
reduce boiler life. Minerals can
build up in sections, reducing heat
transfer, overheating cast iron, and
causing section failure.

1.

Check system piping for leaks

. If found, shut

down boiler and repair immediately.

2.

Vent air from system

using manual vents. Air in

the system will interfere with circulation and cause
heat distribution problems and noise.

3.

Inspect vent system

thoroughly for signs of

deterioration from corrosion, physical damage or
sagging. In addition — Check for gas-tight seal at
every connection and seam.

Venting system must be sealed
gas-tight

to prevent flue gas spillage

and carbon monoxide emissions
which will result in severe personal
injury or death.

Inspect base insulation

Check to make sure

insulation is

secure

against all four sides of the

base. If insulation is damaged or
displaced,

do not

operate boiler.

Replace or reposition insulation.

Failure to replace

damaged

insulation or reposition insulation
can result in a fire hazard, causing
severe personal injury, death or
substantial property damage.

The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
instructions on

page 60

of this

manual. Failure to comply could
result in severe personal injury.