Pressure test boiler

before

attaching water or gas piping (except as noted below) or electrical

supply.

Prepare boiler for test

1. Remove the shipping nipple (from CGs supply tapping) and remove the boiler relief

valve.

Temporarily

plug the relief valve tapping with a ¾" NPT pipe plug.

2. Remove 1¼" nipple, reducing tee and drain valve from accessory bag. Install in boiler

return connection as shown on page 3 and

Figure 29

, page 56. Install circulator on either

the return or supply.

3. Remove 1¼" nipple, 1¼" tee, bushing and pressure/temperature gauge from accessory

bag. Pipe to boiler supply connection as shown on page 3 and

Figure 29

, page 56. (Use

pipe dope sparingly.)

4. Connect a hose to boiler drain valve, the other end connected to a fresh water supply.

Make sure hose can also be used to drain boiler after test.

5. Connect a nipple and shutoff valve to system supply connection on the 1¼" tee. This

valve will be used to bleed air during the fill. (Valve and nipple are not included with
boiler.)

6. Connect a nipple and shutoff valve to system return connection (at circulator flange if

circulator installed on return). This valve will be used to bleed air during the fill. (Valve
and nipple are not included with boiler.)

Fill and pressure test

1. Open the shutoff valves you installed on supply and return connections.
2. Slowly open boiler drain valve and fresh water supply to fill boiler with water.
3. When water flows from shutoff valves, close boiler drain valve.
4. Close shutoff valves.
5. Slowly reopen boiler drain valve until test pressure on the pressure/temperature gauge

reaches no more than:

45 psig

for boilers with

30 psig relief valve.

75 psig

for boilers with

50 psig relief valve.

6.

Test for no more than 10 minutes at:

45 psig

for boilers with

30 psig relief valve.

75 psig

for boilers with

50 psig relief valve.

Do not leave boiler unattended.

A cold water fill could expand and cause

excessive pressure, resulting in severe personal injury, death or substantial
property damage.

7. Make sure constant gauge pressure has been maintained throughout test. Check for leaks.

Repair if found.

Leaks must be repaired at once.

Failure to do so can damage boiler,

resulting in substantial property damage.

Do not use

petroleum-based

cleaning or sealing compounds in boiler

system. Severe damage to boiler will occur, resulting in substantial property
damage.

Drain and remove fittings

1. Disconnect fill water hose from water source.
2. Drain boiler at drain valve or out hose, whichever provides best access to drain. Remove

hose after draining if used to drain boiler.

3. Remove nipples and valves unless they will remain for use in the system piping.
4. Remove plug from relief valve tapping. See section

3a

to replace relief valve.

2b

Perform hydrostatic pressure test