beautypg.com

Service and maintenance — schedule, Boiler manual – Weil-McLain GOLD CGS 550-110-260/02002 User Manual

Page 35

background image

Part number 550-110-260/0200

35

Boiler Manual

Table 5

Service and maintenance schedules

Service and maintenance —

schedule

10a

Follow the

Service and maintenance

procedures given throughout this manual and in

component literature shipped with the boiler. Failure to perform the service and maintenance

could result in damage to the boiler or system. Failure to follow the directions in this manual

and component literature could result in severe personal injury, death or substantial property

damage.

Service technician

(see following pages for instructions)

Owner maintenance

(see CGs User’s Information Manual for instructions)

A

NNNUAL

START

-

UP

Inspect:

• Reported problems

• Boiler area

• Air openings

• Flue gas vent system (and air piping)

• Pilot and main burner flames

• Water piping

• Boiler heating surfaces

• Burners, base and inlet air box

• Condensate drain system

Service:

• Inducer motor

• Oiled-bearing circulators

Start-up:

• Perform start-up per manual

Check/test:

• Gas piping

• Cold fill and operating pressures

• Air vents and air elimination

• Limit controls and cutoffs

• Expansion tank

• Boiler relief valve

Review:

• Review with owner

Daily

• Check boiler area

• Check air openings

• Check boiler pressure/

temperature gauge

Monthly

• Check boiler interior piping

• Check venting system

• Check air vents

• Check boiler relief valve

• Check condensate drain system

• Check automatic air vents (if

used)

Periodically

• Test low water cutoff (if used)

• Clean vent termination/air intake

screens

Every 6 months

• Oil inducer motor

• Operate relief valve

End of season

• Shut down procedure