beautypg.com

Tandberg Data T40 User Manual

Page 17

background image

StorageLibrary Installation and User Guide

9

3

Unpacking the StorageLibrary

This chapter provides detailed information for preparing the library location.

Caution

After the library is unpacked it needs to acclimate for 8 hours before the power is
turned on.

Finding a Location for the StorageLibrary

The StorageLibrary must be positioned in a stable location.

The StorageLibrary is designed to operate in a horizontal position. Do not attempt to operate the
StorageLibrary in any other position than horizontally.

Make sure a power source is available.

Route any cable to avoid walking on them or pinching them with items placed on or against them.
Pay particular attention to the cord at the wall receptacle, and the point where the cord exits from
the StorageLibrary.

Make sure that object will not fall and liquids will not spill into the chassis openings of the
StorageLibrary.

Make sure the airflow around the front and back of the StorageLibrary is not obstructed.

Make sure there is a minimum of 60cm free space in front of the unit to allow the operator to
safely remove the magazines.

Make sure the display and operator controls can easily be accessed.

Make sure the StorageLibrary is away from the floor and in a clean environment with
temperatures within specifications. See

Specifications.

Unpack

Caution

You must remove the transport locking screws when powering up the unit for the
first time or it will not operate. See the procedure in section

Remove the

Transport Locking Screws.