Powering up and testing the remote annex 6300, 1 verify the remote annex 6300’s operational power, Figure 2-12 . verifying the remote annex 6300 oper – Nortel Networks 6300 User Manual
Page 50: 2 apply power, Powering up and testing the remote annex 6300 -14
Remote Annex 6300 Hardware Installation Guide
Chapter 2
Installing the Remote Annex 6300
2-14
Powering Up and Testing the Remote Annex 6300
Power-up and test your Remote Annex 6300 as follows:
1
Verify the Remote Annex 6300’s operational power range.
Check that the power select switch is set to the 110V position
for operation in the 90 to 130 VAC range, or to the 220V
position for operation in the 180 to 260 VAC range (see
Figure 2-12. Verifying the Remote Annex 6300 Operational Power Range
Setting the power select switch incorrectly can damage the
Remote Annex 6300.
2
Apply power.
Connect the female end of the power cord to the AC line socket.
Connect the male end to an active AC line outlet (see
). Turn the power switch on. The Power LED is
now active.
Power Select
Switch
CONSOLE
10BASE5
10BASET
ISDN PRI
LINK
10BASE2
115