2 secure the cover by installing the 17 screws bac, Power-up and test, 1 reconnect all the cables, including – Nortel Networks 6300 User Manual
Page 130: 2 turn on the unit’s power, 3 set the remote annex to test mode by pressing an, Figure d-4 . setting the remote annex 6300 to test, The ethernet cable, The pri isdn interface cable, The console terminal cable, The power cord
Remote Annex 6300 Hardware Installation Guide
Appendix D
Modem Upgrade Instructions
D-6
2
Secure the cover by installing the 17 screws back into the cover,
starting at the rear and working to the sides.
Do not over-tighten these screws (beyond 10 in-lbs.
of torque).
Power-up and Test
The following instructions describe the power-up and test sequence.
1
Reconnect all the cables, including:
❑
The Ethernet cable
❑
The PRI ISDN Interface cable
❑
The console terminal cable
❑
The power cord
2
Turn on the unit’s power.
3
Set the Remote Annex to Test mode by pressing and holding the
button (located on the front panel) for three seconds
(see
).
The Remote Annex runs its ROM-resident power-up diagnostics.
Figure D-4. Setting the Remote Annex 6300 to Test Mode
Reset
Reset
Button
Bay Networks
Remote Annex 6300
Xylogics, a Bay Networks Company
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
Modem Status
14
13
12
11
10
9
8
7
6
5
4
3
2
1
CD
Tx/Rx
13-16 9-12
5-8
1-4
29-32 25-28 21-24 17-20
Modem Config
Status
Test Sync Los
Red
Yel
Blu
Stat
Traf
Setup
Reset
Power
Attn
Network/Status
Ararms
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
PRI Channel Status