Table 2 task completion checklist – Nortel Networks 5100 User Manual
Page 14
14
Overview
The tasks in the MCS 5100/CS 1000 systems integration process are listed
in
Table 1 "Task Completion Checklist" (page 14)
. Use this checklist to
implement the integration.
Table 1
Task Completion Checklist
Task
Reference
Configure the SIP protocol
1.
2.
"Defining customer to support ISDN" (page 26)
Configure the SIP Gateway
"Configuring the SIP Gateway" (page 29)
"Enabling the SIP Virtual Trunk application" (page 31)
Configure the SIP Redirect
Server and URI Map
"Configuring the SIP Redirect Server and URI map"
(page 34)
Configure the SIP Call Server
1.
"Creating the virtual D-channel" (page 36)
2.
"Configuring zones (LD 117)" (page 38)
3.
"Creating the virtual route (LD 16)" (page 41)
4.
"Creating the virtual trunks (LD 14)" (page 44)
5.
"Creating the Network Control Block (NCTL) for
network access (LD 87)" (page 45)
6.
"Creating the ESN data block for CDP" (page 46)
7.
"Creating the RLB for the virtual trunk route (LD 86)"
(page 49)
8.
"Creating the CDP steering codes (LD 87)" (page 51)
9.
"Checking CODEC and QoS settings" (page 53)
Configure CS 1000 users
1.
"Configuring Application Module Link (LD 17)" (page
55)
2.
"Configuring Value Added Server (LD 17)" (page 56)
3.
"Configuring the Automatic Call Distribution
Directory Number (LD 23)" (page 57)
4.
"Configuring a Control Directory Number (LD 23)"
(page 58)
5.
"Configuring Service DN for Converged Desktop
(LD 90)" (page 59)
6.
"Configuring Personal Call Assistant (LD 11)" (page
61)
7.
"Configuring the Signaling Server" (page 62)
8.
"Configuring Converged Desktop users (LDs 10/11)"
(page 67)
Enterprise: Common
Solution Integration Guide for Communication Server 1000/Multimedia Communication Server 5100
NN49000-301
01.01
Standard
Release 4.5
27 October 2006
Copyright © 2006, Nortel Networks
Nortel Networks Confidential
.