Menu hierarchy, Status, Configuration – Paradyne 9820-2M User Manual
Page 214: Test
Menu Hierarchy
A-2
9820-A2-GB20-20
June 2000
00-16786a
Menu Hierarchy
Status
System and Test Status
LMI Reported DLCIs
PVC Connection Status
Network Interface Status
IP Routing Table
Performance Statistics
Trap Event Log
Display LEDs and
Control Leads
Identity
I
dentity – System
and NAM
• System Name,
Contact and
Location
• Serial Number
• Current and
Alternate Software
Revisions
• Hardware Revision
• Ethernet MAC Address
Network LMI
Reported
DLCIs
• DLCI
• Status
• CIR (bps)
PVC Connection
Status
• Source Link,
DLCI, EDLCI
• Primary
Destination Link,
DLCI, EDLCI,
Status
• Alternate
Destination Link,
DLCI, EDLCI,
Status
*
MAIN MENU
Status
Test
Configuration
Auto-Configuration
Control
Easy Install
*
Network
Interface
Status
• Operating
Rate
System and
Test Status
• Self-Test
Results
• Health and
Status
• Test Status
• Last System
Reset
*
Performance
Statistics
• Service Level
Verification
• DLCI
• Frame Relay
• Ethernet
*
• Clear All Statistics
Trap Event
Log
• Time Elapsed
Since Event
• Event
IP Routing
Table
• Destination
• Mask
• Gateway
• Hop
• Type
• Interface
• TTL
Load
Configuration
from:
Configuration
Edit/Display
System
Network
Data Ports
PVC Connections
Management and
Communication
Network and
Data Ports
•
Physical
•
Frame Relay
•
DLCI Records
MAIN MENU
Status
Test
Configuration
Auto-Configuration
Control
Easy Install
*
System
•
Frame Relay and LMI
•
Service Level
Verification
•
General
PVC Connection
Table
•
Source Link, DLCI,
EDLCI
•
Primary Destination Link,
DLCI, EDLCI
• Alternate
Destination Link,
DLCI, EDLCI
New or Modify
PVC Connection Entry
Management and
Communication Options
•
Node IP
•
Management PVCs
•
General SNMP Management
•
Telnet and FTP Session
•
SNMP NMS Security
•
SNMP Traps
• Ethernet Port
*
•
Communication Port
•
External Modem
**
• Modem Port
*
New or Modify
Management
PVC Entry
IP Ping
• IP Address
• Status
Data Port
Physical Tests
• DTE Loopback
MAIN MENU
Status
Test
Configuration
Auto-Configuration
Control
Easy Install
*
Test
PVC Tests:
Network
Data Port
Physical Tests:
Data Port
Other:
IP Ping
Lamp Test
Abort All Tests
PVC Tests
(DLCI Number)
• PVC Loopback
• Send Pattern
• Monitor Pattern
•
Connectivity
*
*
9820-45M
**
9820, 9820-2M, 9820-8M