beautypg.com

Hardware maintenance (9820- 45m), Overview, Hardware maintenance (9820-45m) – Paradyne 9820-2M User Manual

Page 209: Chapter 12

background image

12-1

9820-A2-GB20-20

June 2000

Hardware Maintenance
(9820-45M)

12

Overview

The FrameSaver SLV 9820-45M is designed for years of trouble-free service.
There are actions you can take to further reduce the likelihood and amount of
down time:

Area of Concern

Action

Front Panel Assembly

1. Vacuum dust from air vents whenever a buildup is

visible. See

Cleaning the Front Panel Assembly

on

page 12-2.

2. Monitor LEDs for fan failures. Replace the front panel

assembly immediately upon failure. See

Replacing the

Front Panel Assembly

on page 12-3.

3. Test LEDs periodically. Replace the front panel

assembly immediately upon failure. See

Replacing the

Front Panel Assembly

on page 12-3.

Power Modules

Monitor LEDs for power module failures. Replace a failed
power module immediately. See

Replacing a Power

Module

on page 12-4.

This manual is related to the following products: