Verifying the installation, Configuring line module redundancy, The next step – Juniper Networks E-Series User Manual
Page 76: Verifying the installation -16

CHAPTER 5
Installing Modules
5-16
Verifying the Installation
To verify that the installation is complete:
1
After you have cabled the system for power (see
), turn on the power switches.
The system reboots.
2
Issue the
show redundancy command, and verify that the display
shows the redundancy hardware.
Configuring Line Module Redundancy
For information about configuring line module redundancy, refer to
E-Series System Basics Configuration Guide, Chapter 5, Managing Line
Modules and SRP Modules
.
The Next Step
After you install the modules, you can connect cables to the system. Turn
to