beautypg.com

Standard compliances – Motorola ATCA-717 User Manual

Page 32

background image

Introduction

Standard Compliances

32

PENT/ATCA−717

Standard Compliances

Standard

Description

UL 60950−1
EN 60950−1
IEC 60950−1
CAN/CSA C22.2 No 60950−1

Legal safety requirements

EN 55022
EN 55024
EN 300386
FCC Part 15

a

EMC requirements on system level (predefined
Motorola system)

ANSI/IPC−A610 Rev.C Class 2
ANSI/IPC−7711
ANSI/IPC−7721
ANSI−J−001...003

Manufacturing Requirements

ISO 8601

Y2K compliance

NEBS Standard GR−63−CORE,
NEBS Standard GR−1089 CORE

NEBS level three
Product is designed to support NEBS level three.
The compliance tests must be done with the
customer target system.

PICMG 3.0 R1.0

Defines mechanics, blade dimensions, power
distribution, power and data connectors, and
system management

Note:

a

This blade contains an embedded power source rated >150W. To achieve NEBS

compliance on system level, Shelf Ground (chassis ground) and Logic Ground (logic
signal return) have to be connected. The connection may be implemented inside the
shelf, e.g. at the backplane, or the shelf has to provide a possibility to lead Logic
Ground out of the shelf for external connection to Central Office Ground. For further
information refer to Telcordia GR−1089−CORE, section 9.8.2, requirement R9−14.

a