beautypg.com

Start-up procedure – Hawk Industries Hawkjaw Sr. Manual 100K-2GSR Serial Numbers 101 to 120 User Manual

Page 17

background image

Start-up Procedure

1. Connect the air power source

with the Air (A) line.

2. Make sure the hydraulic

reservoir is full.

3. Make sure the hydraulic

Pressure (P) and Tank (T) lines
are connected. The Pressure line
(P) Quick Disconnect is male.

4. Make sure the "E" stop (E) is

pulled out.

5. Check for hydraulic leaks. If

leaks occur, see Trouble
Shooting.

6. With the exception of the hooks

retracting, no motion should
occur. If any other parts on the
HawkJaw move, see Trouble
Shooting.

E

Operation

NOTE

Tightly connect the quick
disconnects
. A loose connection
causes a pressure drop in the
hydraulic fluid which heats up the
fluid and reduces component life.

NOTE

Use only Hawk approved quick
disconnects
.

17

Operation

Part Numbers

Part Name

Part #

Male Quick Disconnect (P)

061-H52

Female Quick Disconnect (T) 061-H53
Male Air Quick Disc. (A)

061-A12M

Female Air Quick Disc.

061-A12F

P

A

T